case study
Montagu Mansions

Description of Work

Montagu Mansions consists of 6 blocks with a total of 159 residences of varying sizes. The buildings were suffering from a lack of mains water pressure as well as an ageing system of storage tanks and pipework. This problem was addressed by Phase 1 of the work.

The domestic hot water system and the heating of communal areas were also giving cause for concern, and this was addressed in Phase 2.

Phase 1. Installation of potable water storage tanks and booster pumps.

Phase 2. Replacement of communal boilers, storage calorifiers, pumps, controls and associated equipment. Replacement of distribution mains from boiler and calorifier rooms to the six blocks.

Key Facts

Phase 2 - £800,000

Helios Project Management Ltd

H W Design Ltd